Natural gas production during May, 2019 was 2738.92 MMSCM which is 0.4% higher when compared with May, 2018 but 4.81% lower than the target for the month. Cumulative natural gas production during April-May, 2019 was 5394.81 MMSCM which is marginally higher by 0.07% than the production during corresponding period of last year but 4.56% lower than target for the period. Unit-wise natural gas production for the month of May, 2019 and cumulatively for the period April-May, 2019 vis-à -vis same period of last year has been shown in Table-1 and month-wise in Figure-1.
Table-1: Natural Gas Production (MMSCM)
Figure-1: Monthly Natural Gas Production
- Natural gas production by ONGC during May, 2019 was 2082.39 MMSCM which is 5.09% higher when compared with May, 2018 but 2.34% lower than the monthly target. Cumulative natural gas production by ONGC during April-May, 2019 was 4120.10 MMSCM which is 4.21% higher than the production during the corresponding period of the last year but 2.52% lower than the cumulative target.
- Natural gas production by OIL during May, 2019 was 230.89 MMSCM which is 1.52% higher than May, 2018 but 19.61% lower than the monthly target. Cumulative natural gas production by OIL during April-May, 2019 was 455.38 MMSCM which is target 1.45% higher than the production during the corresponding period of last year but 19.23% lower than the cumulative. Major reason for lower production is loss of potential in Deohal area due to presence of CO2 in production stream and blockade in operational areas.
- Natural gas production by Pvt/JVs during May, 2019 was 425.64 MMSCM which is 7.06% lower than the monthly target and17.99% lower when compared with May, 2018. Cumulative natural gas production by Pvt/JVs during April-May, 2019 was 819.34MMSCM which is 4.98% lower than the cumulative target and17.11% lower than the production during the corresponding period of last year. Reasons for shortfall in production are as under:
- KG-DWN-98/3 (RIL): MA field ceased production and closure of 2 wells in D1D3 field.
- Â KG-OSN-2001/3 (ONGC): Delay in anticipated production from well DDW D-5.
- AAP-ON-94/1 (HOEC): Less Production due to low consumer demand. Raniganj East CBM Block (ESSAR): Few wells closed for planned maintenance and refrac jobs. Major customer ‘Matix’ operational shutdown.