NTPC Limited, is celebrating another significant achievement through its subsidiary, NTPC Mining Ltd (NML). On 25th February 2024, NML surpassed the milestone of producing 100 Million Metric Tonnes (MMT) of coal.
The landmark achievement reflects NTPC Mining’s commitment to enhancing coal production from its captive mines. This not only contributes to NTPC’s fuel security but also ensures an efficient supply to meet the nation’s energy needs.
Since its inception on January 1st, 2017, when coal production commenced in its first coal mine, Pakri Barwadih, NTPC Mining has made significant strides. The cumulative quantity of coal produced by NTPC Mining Ltd reached 100.04 MMT on the noteworthy day.
A significant aspect of this achievement is the pace at which the second 50 MMT was produced, achieved in just 617 days. This reflects the relentless commitment and dedication of NTPC Mining towards achieving sustained growth in coal production.
Currently, NTPC Mining Ltd. operates five captive coal mines, namely Pakri Barwadih, Chatti Bariatu, and Kerandari Coal Mines in Jharkhand, Dulanga Coal Mine in Odisha, and Talaipalli Coal Mine in Chhattisgarh. This broad operational reach allows NTPC to secure a stable and reliable fuel supply.
To ensure this continuous growth trajectory, NTPC has implemented a range of strategies and technologies. These include the adoption of rigorous safety measures, improved mine planning, equipment automation, workforce training, and the implementation of continuous monitoring and analysis systems.